Título: APLICAÇÃO DA METODOLOGIA SMED PARA OTIMIZAÇÃO DA MESA DENSIMÉTRICA ESTUDO DE CASO EM UMA UNIDADE DE BENEFICIAMENTO DE SEMENTES DE MILHO
Título alternativo: APPLICATION OF THE SMED METHODOLOGY FOR DENSIMETRIC TABLE OPTIMIZATION CASE STUDY IN A CORN SEED PROCESSING UNIT
Autoria de: Ana Alice Aleixo Brangioni
Orientação de: Heloisa Oliveira dos Santos
Presidente da banca: Heloisa Oliveira dos Santos
Primeiro membro da banca: Pablo Messias Andrade
Segundo membro da banca: Ludimila Turino Dutra Carvalho
Palavras-chaves: SMED, setup, mesa densimétrica, sementes de milho pré-comercial, beneficiamento de sementes
Data da defesa: 11/06/2026
Semestre letivo da defesa: 2026-1
Data da versão final: 25/06/2026
Data da publicação: 25/06/2026
Referência: Brangioni, A. A. A. APLICAÇÃO DA METODOLOGIA SMED PARA OTIMIZAÇÃO DA MESA DENSIMÉTRICA ESTUDO DE CASO EM UMA UNIDADE DE BENEFICIAMENTO DE SEMENTES DE MILHO . 2026. 35 p. Trabalho de Conclusão de Curso (Graduação em Agronomia Bacharelado)-Universidade Federal de Lavras, Lavras, 2026.
Resumo: A produção de sementes de milho pré-comercial exige elevada regularidade operacional durante o beneficiamento, uma vez que a alternância frequente de materiais, peneiras e volumes processados demanda preparações recorrentes nos equipamentos. Entre essas operações, a mesa densimétrica destaca-se como etapa crítica por realizar a classificação das sementes com base na massa específica, exigindo ajustes e trocas entre lotes. Nesse contexto, o tempo de setup pode representar parcela significativa do tempo improdutivo, especialmente quando atividades passíveis de antecipação são realizadas com a máquina parada. Assim, objetivou-se aplicar os princípios da metodologia SMED (Single Minute Exchange of Die) para analisar o processo de setup da mesa densimétrica e propor melhorias voltadas à redução do tempo improdutivo em uma unidade de beneficiamento de sementes de milho pré-comercial localizada no Triângulo Mineiro. O estudo foi conduzido como estudo de caso, com abordagem quantitativa e descritiva, a partir de observação direta e cronometragem das atividades realizadas durante seis dias de operação. Foram identificados 17 setups completos nos cinco dias regulares de coleta, totalizando 223 minutos, dos quais 38,1 corresponderam a atividades externas executadas durante a parada. A análise prospectiva indicou que a antecipação sistemática dessas atividades poderia reduzir o tempo total de setup para aproximadamente 138 minutos. Conclui-se que os princípios do SMED se mostraram adequados para identificar perdas no processo de setup, evidenciando que parte expressiva do tempo improdutivo da mesa densimétrica esteve associada a fatores logísticos e de padronização, e não apenas à complexidade técnica da troca.
Abstract: Pre-commercial corn seed production requires high operational regularity during seed processing, since the frequent alternation of materials, sieves, seed sizes, and processed volumes demands recurrent equipment preparation. Among these operations, the densimetric table stands out as a critical step because it classifies seeds based on specific mass, requiring adjustments and changeovers between lots. In this context, setup time may represent a significant portion of unproductive time, especially when activities that could be anticipated are performed while the machine is stopped. Therefore, this study aimed to apply the principles of the SMED methodology (Single Minute Exchange of Die) to analyze the setup process of the densimetric table and propose improvements focused on reducing unproductive time in a pre-commercial corn seed processing unit located in the Triângulo Mineiro region. The study was conducted as a case study, with a quantitative and descriptive approach, based on direct observation and timing of the activities performed during six days of operation. The activities were classified, according to SMED principles, as internal, external, or eliminable, also considering whether they occurred while the densimetric table was stopped or operating. Seventeen complete setups were identified during the five regular data collection days, totaling 223 minutes of downtime, with an average setup time of 13.1 minutes and a range from 2 to 51 minutes per setup. Of the total observed time, 85 minutes corresponded to external activities performed while the machine was stopped, especially waiting for the forklift and material dumping, representing 38.1 of the total setup time. The prospective analysis indicated that the systematic anticipation of these activities could reduce the total setup time to approximately 138 minutes, with an estimated average reduction of 38.1 and a decrease in the average setup time from 13.1 to 8.1 minutes. It is concluded that the principles of the SMED methodology were suitable for identifying losses associated with the organization of changeover activities, showing that a significant portion of the unproductive time of the densimetric table is related to logistical and standardization factors, and not only to the technical complexity of the process.
URI alternaviva: sem URI do Repositório Institucional da UFLA até o momento.
Curso: G001 - AGRONOMIA (BACHARELADO)
Nome da editora: Universidade Federal de Lavras
Sigla da editora: UFLA
País da editora: Brasil
Gênero textual: Trabalho de Conclusão de Curso
Nome da língua do conteúdo: Português
Código da língua do conteúdo: por
Licença de acesso: Acesso aberto
Nome da licença: Licença do Repositório Institucional da Universidade Federal de Lavras
URI da licença: repositorio.ufla.br
Termos da licença: Acesso aos termos da licença em repositorio.ufla.br
Detentores dos direitos autorais: Ana Alice Aleixo Brangioni e Universidade Federal de Lavras
Baixar arquivo